Bond Information

2009

FOLDING LUNCHRM TABLES

001 FOLDING LUNCHRM TABLES - INSTALL SURFACE MOUNTED POCKET TABLES.

ADA COMPLIANCE

001 ADA COMPLIANCE - LEVEL 1 - Comply with DPS Design and Construction Standards SECTION 00700:ACCESSIBILITY STANDARDS and all other applicable DPS Standards. See ADA Level 1 Database provided.Deficiency remedies provided in ADA database should serve as the PM guide only and should not be provided to theA/E for purposes of developing the project scope of work. A/E is directed to conduct a building survey limited to theareas identified in the survey. Other ADA deficiencies may be included if they meet the level 1 status and have notbeen identified in the survey. All questions of possible oversight of a deficiency shall be directed to DPS FacilityPlanning through the DPS Project Manager.

FINISH RESTORATION

001 FINISH RESTORATION / PAINT - Repaint all surfaces to include but not limited to, all tile and hard ceilings,walls, doorjambs, doors, woodwork, ductwork, univents, radiators and built-in wood or metal cabinets, bathroompartitions painted or baked-on finish. All rooms, corridors, stairwells, closets, storage, mechanical rooms andpiping per DPS piping color code. Duct cleaning is required in this scope.

2010

LEARNING LANDSCAPE

001 LEARNING LANDSCAPE - Construct Learning Landscape per UCD Master Plan. Include 2" playground surfaceasphalt overlay. Remove existing and replace playground asphalt. Coordinate with treated timbers replacement.See master plan draft at www.learninglanscapes.org - Conduct soils asphalt and other pertinent testing prior to bid development.

ABSORPTION CHILLER

001 ABSORBTION CHILLER - Replace with Centrifugal Water Chiller. Water treament included w/18 month warranty.Startup and commissioning included. Comply with DPS Design and Construction Standards SECTION 15650:REFRIGERATION, and all other applicable DPS Standards. Patch and repair.

WINDOWS

001 WINDOWS - METAL - Replace with current DPS standards. Coordinate with ongoing chiller work on-site .