2009
BOILER
001 BOILER - Replace boiler as per DPS guide specs 15555C. Replace in boiler room: condensate return pumps,steam traps, condensate return pipe, boiler feed pipe, and all valves. Ref. spec. 15110, 15521, and all div. 15 thatapply including water treatment associated with this project ref. 15548.
002 BOILER - Replace boiler as per DPS guide specs 15555C. Replace in boiler room: condensate return pumps,steam traps, condensate return pipe, boiler feed pipe, and all valves. Ref. spec. 15110, 15521, and all div. 15 thatapply including water treatment associated with this project ref. 15548.
2011
ADA COMPLIANCE
001 ADA COMPLIANCE - LEVEL 1 - Comply with DPS Design and Construction Standards SECTION 00700:ACCESSIBILITY STANDARDS and all other applicable DPS Standards. See ADA Level 1 Database provided.Deficiency remedies provided in ADA database should serve as the PM guide only and should not be provided to theA/E for purposes of developing the project scope of work. A/E is directed to conduct a building survey limited to theareas identified in the survey. Other ADA deficiencies may be included if they meet the level 1 status and have notbeen identified in the survey. All questions of possible oversight of a deficiency shall be directed to DPS FacilityPlanning through the DPS Project Manager.
FINISH RESTORATION
001 FINISH RESTORATION / PAINT - Repaint all surfaces to include but not limited to, all tile and hard ceilings,walls, doorjambs, doors, woodwork, ductwork, univents, radiators and built-in wood or metal cabinets, bathroompartitions painted or baked-on finish. All rooms, corridors, stairwells, closets, storage, mechanical rooms andpiping per DPS piping color code. Duct cleaning is required in this scope.
ASPHALT PAVING
003 ASPHALT / PARKING - Construct parking lot expansion for Valverde parking. Est. 12000 sf parking lot to beconstructed west of existing parking lot on south side of school on Tejon Street.
IRRIGATION
001 IRRIGATION - Replace the item.
LEARNING LANDSCAPE
001 LEARNING LANDSCAPE - Construct Learning Landscape per UCD Master Plan.
2013
FIRE SUPPRESSION / SPRINKLER
001 FIRE SPRINKLER SYSTEM - Design new fire sprinkler system throughout entire building. Comply with DPSDesign and Construction Standards SECTION 15300: STANDPIPE AND FIRE SPRINKLER STANDARDS andall other applicable DPS Standards. Patch and Repair.