School Details

Teller (281)

School Website | Bond Information for this School

1150 Garfield St. 80206
Tel: 303-333-4285
Fax: 720-424-3585

Principal: Jennifer Barton

Grade Levels: ECE - Grade 5

Full-Day Kindergarten: Yes
Kaleidoscope Corner: Yes
Magnet Program: No
Uniforms: No



Programs

Contact the school.


Bond Information

2009

FINISH RESTORATION

000 FINISH RESTORATION / PAINT - Repaint all surfaces required to include but not limited, All tile and hardceilings, walls, doorjambs, doors, woodwork, ductwork, univents, radiators and built-in wood or metal cabinets,bathroom partitions, painted or baked-on finishes. All rooms, corridors, stairwells, closets, storage, mechanicalrooms and piping per DPS piping color code. Duct cleaning is required in this scope, but costs are listed under anHVAC asset and listed separately.

FINISH RESTORATION

001 FINISH RESTORATION / CARPET - Replace the item.

2010

LEARNING LANDSCAPE

001 LEARNING LANDSCAPE - Construct Learning Landscape per UCD Master Plan. Include 2" playground surfaceasphalt overlay. See master plan draft at www.learninglanscapes.org - Conduct soils asphalt and other pertinenttesting prior to bid development.

2011

FIRE DETECTION

001 FIRE DETECTION SYSTEM - Panel only. No longer supported by Manufacture.

FIRE SUPPRESSION / SPRINKLER

001 FIRE SPRINKLER SYSTEM - Design new fire sprinkler system throughout entire building. Comply with DPSDesign and Construction Standards SECTION 15300: STANDPIPE AND FIRE SPRINKLER STANDARDS andall other applicable DPS Standards. Patch and Repair.

2013

ROOFING

010 ROOFING / EPDM / PVC / SINGLE-PLY - Replace the item.