Bond Information
2009
FOLDING LUNCHRM TABLES
001 FOLDING LUNCHRM TABLES - INSTALL SURFACE MOUNTED POCKET TABLES.
REGULATORY / LIGHT FIXTURES
001 REGULATORY LIGHT FIXTURES - Replace all T-12 and incandescent lighting fixtures with T-8 or T5HOfixtures. Properly dispose of all existing lamps and fixtures. Comply with DPS Design and Construction StandardsSECTIONS 16501: LAMPS, 16502 BALLASTS AND CONTROLS and 16510: LUMINAIRES and all otherapplicable DPS Standards. Patch and Repair.
BUILDNG (NEW)
001 PLACE MODULAR CLASSROOMS FOR ECE EXPANSION FULL DAY PROGRAMS.
2012
IRRIGATION
001 IRRIGATION - Replace the item.
LEARNING LANDSCAPE
001 LEARNING LANDSCAPE - Construct Learning Landscape per UCD Master Plan. Include 2" playground surfaceasphalt overlay.
2013
ADA COMPLIANCE
001 ADA COMPLIANCE - LEVEL 1 - Comply with DPS Design and Construction Standards SECTION 00700:ACCESSIBILITY STANDARDS and all other applicable DPS Standards. See ADA Level 1 Database provided.Deficiency remedies provided in ADA database should serve as the PM guide only and should not be provided to theA/E for purposes of developing the project scope of work. A/E is directed to conduct a building survey limited to theareas identified in the survey. Other ADA deficiencies may be included if they meet the level 1 status and have notbeen identified in the survey. All questions of possible oversight of a deficiency shall be directed to DPS FacilityPlanning through the DPS Project Manager.
FINISH RESTORATION
000 FINISH RESTORATION / PAINT - Repaint all surfaces to include but not limited to, all tile and hard ceilings,walls, doorjambs, doors, woodwork, ductwork, univents, radiators and built-in wood or metal cabinets, bathroompartitions painted or baked-on finish. All rooms, corridors, stairwells, closets, storage, mechanical rooms andpiping per DPS piping color code. Duct cleaning is required in this scope.