2009

BOILER

001 BOILER - Replace boiler as per DPS guide specs 15555C. Replace in boiler room: condensate return pumps,steam traps, condensate return pipe, boiler feed pipe, and all valves. Ref. spec. 15110, 15521, and all div. 15 thatapply including water treatment associated with this project ref. 15548.

002 BOILER - Replace boiler as per DPS guide specs 15555C. Replace in boiler room: condensate return pumps,steam traps, condensate return pipe, boiler feed pipe, and all valves. Ref. spec. 15110, 15521, and all div. 15 thatapply including water treatment associated with this project ref. 15548.

REGULATORY / LIGHT FIXTURES

001 REGULATORY LIGHT FIXTURES - Replace all T-12 and incandescent lighting fixtures with T-8 or T5HOfixtures. Properly dispose of all existing lamps and fixtures. Comply with DPS Design and Construction StandardsSECTIONS 16501: LAMPS, 16502 BALLASTS AND CONTROLS and 16510: LUMINAIRES and all otherapplicable DPS Standards. Patch and Repair.

2011

FIRE SUPPRESSION / SPRINKLER

001 FIRE SUPPRESSION / SPRINKLER SYSTEM - INSTALL FIRE SUPPRESSION SYSTEM THROUGHTOUTBUILDING.

HEALTH SAFETY / HAZARD ABATEMENT

001 HEALTH SAFETY / HAZARD ABATEMENT - REPLACE TREATED WOOD TIMBERS WITH RECYCLEDPLASTIC TIMBERS.

ASPHALT PAVING

001 ASPHALT / VEHICLE PARKING AND DRIVEWAYS - 2" overlay with geotec material.

LEARNING LANDSCAPE

001 LEARNING LANDSCAPE - Construct Learning Landscape per UCD Master Plan. Include 2" playground surfaceasphalt overlay.

2013

REMODEL - SAFETY

002 REMODEL - SAFETY - Install safety shower, eyewash, chemical storage cabinet and fume hood.

FINISH RESTORATION

000 FINISH RESTORATION / SEAMLESS FLR - replace all seamless with ceramic/quarry tile.

TOILET ROOM (INCLUSIVE)

001 Toilet Room (inclusive) - Replace all fixtures, plumbing piping and partitions. Paint walls and Ceilings. Replace tileas required. Lighting to be updated. Repair any associated surface damage, i.e., glazed block, etc.