School Details
Oakland (256)
School Website | Bond Information for this School
4580 Dearborn St. 80239
Tel: 303-371-2960
Fax: 720-424-5095
Principal: Reggie Robinson
Grade Levels: ECE - Grade 5
Full-Day Kindergarten: Yes
Kaleidoscope Corner: No
Magnet Program: No
Uniforms: No
Programs
Contact the school.
Bond Information
2009
FOLDING LUNCHRM TABLES
001 FOLDING LUNCHRM TABLES - INSTALL SURFACE MOUNTED POCKET TABLES
FIRE DETECTION
001 FIRE DETECTION SYSTEM - Detectors only. New FACP installed
FINISH RESTORATION
001 FINISH RESTORATION / SEAMLESS FLR - replace all seamless with ceramic/quarry tile.
2010
BOILER
002 BOILER REPLACEMENT - Design for replacement of two boilers, and the removal of material and equipment nolonger needed. rhimes: This is a complete replacement. Include condensate return tank. Include startup and commissioning. Replaceexisting heat exchanger with new domestic hw Aerco Boiler.In the boiler room replace: condensate return pumps,steam traps, condensate return pipe, boiler feed pipe, and all valves. Design shall include water treatment.Asbestos management by DPS and not included in this scope. Comply with DPS Design and ConstructionStandards SECTION 15555C: CAST IRON BOILER PERFORMANCE SPEC, 15110: VALVES, 15521: STEAMAND CONDENSATE PIPING SPECIALTIES and all other applicable DPS Standards. Patch and repair insulation.
VENTILLATION / CENTRAL FAN / AHU
001 VENTILLATION - CENTRAL FAN - AHU - Attention this scope of work cannot proceed unless it is bundled with HENS C Temp Controls /Environment Scope. Design for HVAC replacement, and the removal of material andequipment no longer needed. Comply with DPS Design and Construction Standards Division 15 (applicablesections) and all other applicable DPS Standards. Patch and repair. Replace all unit-ventilators, replace steamand condensate feeds back to main, and replace all steam traps including drip and end of main. Include case workrequired to accommodate new unit-ventilators. All other central air-handling units need commercial cleaning, ductwork repaired as needed, new motors, replace branch piping if needed, steam traps, fan bearings and dampersections. Replace all Exhaust Fans including dampers. Replace steam traps as needed. Ductwork cleaning asneeded.
TEMP CONTROLS / ENVIRONMENT
001 TEMP CONTROLS - ENVIRONMENT - Design for temperature controls replacement, and the removal ofmaterial and equipment no longer needed. Comply with DPS Design and Construction Standards SECTIONS15950: CONTROLS, 15975: INTEGRATED BUILDING AUTOMATION SYSTEM (IBAS) and all other applicableDPS Standards. Patch and repair. Install digital controls and central energy management system. Confirm thatthis is to include IBAS (note: parent project for Oakland also includes boiler and ventilation/central fan/AHU.)
2011
LEARNING LANDSCAPE
001 LEARNING LANDSCAPE - Construct Learning Landscape per UCD Master Plan. Include 2" playground surfaceasphalt overlay.