School Details
Garden Place (241)
School Website | Bond Information for this School
4425 Lincoln St. 80216
Tel: 303-295-7785
Fax: 720-424-7245
Principal: Robert Villarreal
Grade Levels: ECE - Grade 6
Full-Day Kindergarten: Yes
Kaleidoscope Corner: No
Magnet Program: No
Uniforms: No
Programs
Contact the school.
Bond Information
2009
VIDEO SECURITY
001 Video Security - Re-check MDF size to install rack
ROOFING
001 ROOFING - BUILT-UP - Built-Up roofing to include the following: Gravel, 4-ply membrane,replace existing perlitewith 1/2" wood fiber, 1/8" taper insulation, replace exsiting polyisocyanurate insulation with 2 layers of 2"polyisocyanurate insulation, replace flashing per DPS specs at all walls, drains, conduits, flues, gas lines, exhaustscurbs, thru-wall and overflow scuppers, skylights, A/C lines, expansion joints, and parapets. Replace all gaspipeand similiar stand supports bases with concete pavers, paint all existing gas piping per DPS specs. Replace andseal all existing pipe collars. Inspect/replace all applicable drains and gutters.
003 ROOFING - BUILT-UP - Built-Up roofing to include the following: Gravel, 4-ply membrane,replace existing perlitewith 1/2" wood fiber, 1/8" taper insulation, replace exsiting polyisocyanurate insulation with 2 layers of 2"polyisocyanurate insulation, replace flashing per DPS specs at all walls, drains, conduits, flues, gas lines, exhaustscurbs, thru-wall and overflow scuppers, skylights, A/C lines, expansion joints, and parapets. Replace all gaspipeand similiar stand supports bases with concete pavers, paint all existing gas piping per DPS specs. Replace andseal all existing pipe collars. Inspect/replace all applicable drains and gutters.
004 ROOFING - BUILT-UP - Built-Up roofing to include the following: Gravel, 4-ply membrane,replace existing perlitewith 1/2" wood fiber, 1/8" taper insulation, replace exsiting polyisocyanurate insulation with 2 layers of 2"polyisocyanurate insulation, replace flashing per DPS specs at all walls, drains, conduits, flues, gas lines, exhaustscurbs, thru-wall and overflow scuppers, skylights, A/C lines, expansion joints, and parapets. Replace all gaspipeand similiar stand supports bases with concete pavers, paint all existing gas piping per DPS specs. Replace andseal all existing pipe collars. Inspect/replace all applicable drains and gutters.
006 ROOFING - BUILT-UP - Built-Up roofing to include the following: Gravel, 4-ply membrane,replace existing perlitewith 1/2" wood fiber, 1/8" taper insulation, replace exsiting polyisocyanurate insulation with 2 layers of 2"polyisocyanurate insulation, replace flashing per DPS specs at all walls, drains, conduits, flues, gas lines, exhaustscurbs, thru-wall and overflow scuppers, skylights, A/C lines, expansion joints, and parapets. Replace all gaspipeand similiar stand supports bases with concete pavers, paint all existing gas piping per DPS specs. Replace andseal all existing pipe collars. Inspect/replace all applicable drains and gutters.
008 ROOFING - BUILT-UP - Built-Up roofing to include the following: Gravel, 4-ply membrane,replace existing perlitewith 1/2" wood fiber, 1/8" taper insulation, replace exsiting polyisocyanurate insulation with 2 layers of 2"polyisocyanurate insulation, replace flashing per DPS specs at all walls, drains, conduits, flues, gas lines, exhaustscurbs, thru-wall and overflow scuppers, skylights, A/C lines, expansion joints, and parapets. Replace all gaspipeand similiar stand supports bases with concete pavers, paint all existing gas piping per DPS specs. Replace andseal all existing pipe collars. Inspect/replace all applicable drains and gutters.
2013
FINISH RESTORATION
001 FINISH RESTORATION / CARPET - Replace the item.
TOILET ROOM (INCLUSIVE)
001 Toilet Room (inclusive) - Replace all fixtures, plumbing piping and partitions. Paint walls and Ceilings. Replace tileas required. Lighting to be updated. Repair any associated surface damage, i.e., glazed block, etc.







