Bond Information

2009

FOLDING LUNCHRM TABLES

001 FOLDING LUNCHRM TABLES - INSTALL SURFACE MOUNTED POCKET TABLES.

VIDEO SECURITY

001 Video Security - Move DVR to MDF, Build wall, install A/C.

ROOFING

001 ROOFING - BUILT-UP - Built-Up roofing to include the following: Gravel, 4-ply membrane,replace existing perlitewith 1/2" wood fiber, 1/8" taper insulation, replace exsiting polyisocyanurate insulation with 2 layers of 2"polyisocyanurate insulation, replace flashing per DPS specs at all walls, drains, conduits, flues, gas lines, exhaustscurbs, thru-wall and overflow scuppers, skylights, A/C lines, expansion joints, and parapets. Replace all gaspipeand similiar stand supports bases with concete pavers, paint all existing gas piping per DPS specs. Replace andseal all existing pipe collars. Inspect/replace all applicable drains and gutters.

002 ROOFING - BUILT-UP - Built-Up roofing to include the following: Gravel, 4-ply membrane,replace existing perlitewith 1/2" wood fiber, 1/8" taper insulation, replace exsiting polyisocyanurate insulation with 2 layers of 2"polyisocyanurate insulation, replace flashing per DPS specs at all walls, drains, conduits, flues, gas lines, exhaustscurbs, thru-wall and overflow scuppers, skylights, A/C lines, expansion joints, and parapets. Replace all gaspipeand similiar stand supports bases with concete pavers, paint all existing gas piping per DPS specs. Replace andseal all existing pipe collars. Inspect/replace all applicable drains and gutters.

003 ROOFING - BUILT-UP - Built-Up roofing to include the following: Gravel, 4-ply membrane,replace existing perlitewith 1/2" wood fiber, 1/8" taper insulation, replace exsiting polyisocyanurate insulation with 2 layers of 2"polyisocyanurate insulation, replace flashing per DPS specs at all walls, drains, conduits, flues, gas lines, exhaustscurbs, thru-wall and overflow scuppers, skylights, A/C lines, expansion joints, and parapets. Replace all gaspipeand similiar stand supports bases with concete pavers, paint all existing gas piping per DPS specs. Replace andseal all existing pipe collars. Inspect/replace all applicable drains and gutters.

004 ROOFING - BUILT-UP - Built-Up roofing to include the following: Gravel, 4-ply membrane,replace existing perlitewith 1/2" wood fiber, 1/8" taper insulation, replace exsiting polyisocyanurate insulation with 2 layers of 2"polyisocyanurate insulation, replace flashing per DPS specs at all walls, drains, conduits, flues, gas lines, exhaustscurbs, thru-wall and overflow scuppers, skylights, A/C lines, expansion joints, and parapets. Replace all gaspipeand similiar stand supports bases with concete pavers, paint all existing gas piping per DPS specs. Replace andseal all existing pipe collars. Inspect/replace all applicable drains and gutters.

005 ROOFING - BUILT-UP - Built-Up roofing to include the following: Gravel, 4-ply membrane,replace existing perlitewith 1/2" wood fiber, 1/8" taper insulation, replace exsiting polyisocyanurate insulation with 2 layers of 2"polyisocyanurate insulation, replace flashing per DPS specs at all walls, drains, conduits, flues, gas lines, exhaustscurbs, thru-wall and overflow scuppers, skylights, A/C lines, expansion joints, and parapets. Replace all gaspipeand similiar stand supports bases with concete pavers, paint all existing gas piping per DPS specs. Replace andseal all existing pipe collars. Inspect/replace all applicable drains and gutters.

008 ROOFING / BUILT UP - Replace BU Roofing.

010 ROOFING - BUILT-UP - Built-Up roofing to include the following: Gravel, 4-ply membrane,replace existing perlitewith 1/2" wood fiber, 1/8" taper insulation, replace exsiting polyisocyanurate insulation with 2 layers of 2"polyisocyanurate insulation, replace flashing per DPS specs at all walls, drains, conduits, flues, gas lines, exhaustscurbs, thru-wall and overflow scuppers, skylights, A/C lines, expansion joints, and parapets. Replace all gaspipeand similiar stand supports bases with concete pavers, paint all existing gas piping per DPS specs. Replace andseal all existing pipe collars. Inspect/replace all applicable drains and gutters.

011 ROOFING - BUILT-UP - Built-Up roofing to include the following: Gravel, 4-ply membrane,replace existing perlitewith 1/2" wood fiber, 1/8" taper insulation, replace exsiting polyisocyanurate insulation with 2 layers of 2"polyisocyanurate insulation, replace flashing per DPS specs at all walls, drains, conduits, flues, gas lines, exhaustscurbs, thru-wall and overflow scuppers, skylights, A/C lines, expansion joints, and parapets. Replace all gaspipeand similiar stand supports bases with concete pavers, paint all existing gas piping per DPS specs. Replace andseal all existing pipe collars. Inspect/replace all applicable drains and gutters.

012 ROOFING - BUILT-UP - Built-Up roofing to include the following: Gravel, 4-ply membrane,replace existing perlitewith 1/2" wood fiber, 1/8" taper insulation, replace exsiting polyisocyanurate insulation with 2 layers of 2"polyisocyanurate insulation, replace flashing per DPS specs at all walls, drains, conduits, flues, gas lines, exhaustscurbs, thru-wall and overflow scuppers, skylights, A/C lines, expansion joints, and parapets. Replace all gaspipeand similiar stand supports bases with concete pavers, paint all existing gas piping per DPS specs. Replace andseal all existing pipe collars. Inspect/replace all applicable drains and gutters.

2010

FIRE SUPPRESSION / SPRINKLER

001 FIRE SPRINKLER SYSTEM - Design new fire sprinkler system throughout entire building. Comply with DPSDesign and Construction Standards SECTION 15300: STANDPIPE AND FIRE SPRINKLER STANDARDS andall other applicable DPS Standards. Patch and Repair.

VENTILLATION / CENTRAL FAN / AHU

001 VENTILLATION - CENTRAL FAN - AHU - Attention this scope of work cannot proceed unless it is bundled with HENS C Temp Controls /Environment Scope. Design for HVAC replacement, and the removal of material andequipment no longer needed. Comply with DPS Design and Construction Standards Division 15 (applicablesections) and all other applicable DPS Standards. Patch and repair. Replace all unit-ventilators, replace steamand condensate feeds back to main, and replace all steam traps including drip and end of main. Include case workrequired to accommodate new unit-ventilators. All other central air-handling units need commercial cleaning, ductwork repaired as needed, new motors, replace branch piping if needed, steam traps, fan bearings and dampersections. Replace all Exhaust Fans including dampers. Replace steam traps as needed. Ductwork cleaning asneeded.

TEMP CONTROLS / ENVIRONMENT

001 TEMP CONTROLS - ENVIRONMENT - Attention this scope of work cannot proceed unless it is bundled with HVNT C Ventilation/Central Fan/ AHU Scope. Design for temperature controls replacement, and the removal ofmaterial and equipment no longer needed. Comply with DPS Design and Construction Standards SECTIONS15950: CONTROLS, 15975: INTEGRATED BUILDING AUTOMATION SYSTEM (IBAS) and all other applicableDPS Standards. Patch and repair. Install digital controls and control devices in new unit-ventilators, retrofit allother central air-handling units with new digital controls, electric damper operators, electric valves and operators.Exhaust fan control should be tied in with HVAC system where required or as was original intent. Includeconvectors, radiators, cabinet heaters, fan-coil units, reheats or other terminal heating equipment in DDC upgrade.Include IBAS interface.

2011

FINISH RESTORATION

001 FINISH RESTORATION / VINYL TILE - Replace existing VAT or VCT with new VCT in corridors and rooms:105,107,200A, 212, and stairs. Price does not include abatement.

SHELL / MASONRY

001 SHELL / MASONRY - Masonry repair,replace,tuck point &caulking as needed.

TOILET ROOM (INCLUSIVE)

001 Toilet Room (inclusive) - Replace all fixtures, plumbing piping and partitions. Paint walls and Ceilings. Replace tileas required. Lighting to be updated. Repair any associated surface damage, i.e., glazed block, etc.

BUILDING (ADDITION)

001 BUILDING (ADDITION) - Expand space for Library collections. Provide addition and/or space reconfiguration toaccommodate larger reading room and accessory library functions.